SECOND - HAND POWER - PLANTS

 

 Scope

Technical Details &Photographs of 1 No. 12/16 MW FRANCO TOSImake Condensing Steam Turbine Generator Set havingan inlet pressure of 62/74 barA :

12/16MWCONDENSING

STEAM TURBINE GENERATOR SET

(WITH3 UNCONTROLLEDBLEEDINGS):

Textfeld: Year of Manufacture 	: 	1976 
Year Retired 	: 	2010 
Condition 	: 	Excellent 
Status 	: 	Installed on foundation 
Note 	: 	Condenser Excluded

 

 

 

 

 

 

 

TURBINE :

Manufacturer: Franco Tosi S.p.A., Legnano, Italy

Type: Single cylinder, reaction steam turbine

Normal Rating: 12,000 kW

MaximumContinuous Rating: 17,000 kW

Rated Speed: 3000 RPM

Inlet Pressure

Normal: 62 bar abs Maximum: 74 bar abs

Inlet Temperature

Normal: 470 Deg. C Maximum: 485 Deg. C

1st Bleeding

Pressure (Normal): 5.16 bar abs Temperature (Normal): 214.6 Deg. C Flow (Normal): 5810 kg/hr

2nd Bleeding

Pressure (Normal): 1.76 bar abs Temperature (Normal):131.1 Deg. C Flow (Normal):3155 kg/hr

3rd Bleeding

Pressure (Normal): 0.43 bar abs Flow (Normal): 1500 kg/hr

Exhaust Pressure

Normal: 0.1 bar abs Maximum: 0.5 bar abs

Inlet Flow

Normal Rating(12,000 kW): 50,767 kg/hr

 

 

ALTERNATOR :

Manufacturer: Technomasio Brown Boveri, Milan, Italy

Type: 2 Pole Apparent Power: 20,000 kVA Power Factor : 0.8 Active Power : 17,000 kW Rated Voltage: 6000V Phases: 3

 

Frequency: 50 Hz

Rated Speed: 3000 RPM

Connection: Star

NOTE :

The above STG Set is presentlystill in operation and is to be shutdown in April this year. It can therefore be inspected in operating condition.

The CondensingSystem is not included in the scope of supplysince the same is being retained bythe owner for another STG Set & also, the same would be unsuitable for operation in Africa.

Exclusions :

Condenser system, complete (not available). Anycivil structures. Insulatingmaterials (to be scrapped). All embedded steel components. Interconnectingpiping(of less than 50 mm diameter). All cables, conduits, and the like (to be scrapped). All fill oils (drained and disposed of). Shippingcontainers.

56 Ton/Hr Boiler

Technical Details, Scope of Supply&Photographs for :

The Boiler is no longer available, though the STG Set can be offered to the client. We suggest that the client purchases a New Boiler to operate with this STG Set. Please advise.
BOILER :
The Boiler is no longer available, though the STG Set can be offered to the client. We suggest that the client purchases a New Boiler to operate with this STG Set. Please advise.

PHOTOGRAPHS :

Commercial Details includingthe FOBPrices & Terms of Offer : Prices:

 

Terms & Conditions of sale :

Delivery : Ex-Site, Europe. Offer : StrictlySubject To Prior Sale And/Or Our Final Confirmation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE :

The above equipments will be delivered dulydismantled, packed &loaded in containers to be placed bythe client, delivered FOBPort, Europe on “As Is Where Is” basis. Sea freight, insurance charges &all other expenses are to be borne by the buyer.

DETAILED LIST SCOPE OFSUPPLY :