1 x Frame
6B Combined Cycle Power Plant
|
|
.
History
Power plant was erected in 1994 and had the first commercial operation
in February 1995. Power plant will remain in stand by operation up to end of
October 2010 (available to the local grid only for peaking expected during
summer 2010), date when the plant should go out of operation, be de-commissioned and available for sale.
Equipment List & main specs
Combined Cycle Power Plant based on
the following equipment list:

department 3
Brief description of main features
1 x GE Gas Turbine model Frame 6B
Frame 6B already incorporates
latest GE upgrading packages like: upgraded brush seals for better efficiency,
higher firing temperature for increased power output, upgraded IGV, Extendor Kit on combustion components to optimize
maintenance and extend inspection intervals.
Gas Turbine Combustion system is Dual Fuel (Natural
Gas + Distillate Oil). Starting System is based on Electric Motor.
At date Frame 6B Gas Turbine accumulated 110.538
Firing Hours. Second major Inspection to the Gas Turbine was completed last
year.
45
MVA Alstom Generator (for GT), model T190 – 240. Spare stator for
this generator is available at stock.
Mark
V Control System.
Emission
control by Steam injection on gas turbine: at 15°C ambient temperature, with GT
full power output around 40 MW and about 2 Kilogram / sec of steam injection,
emission levels are roughly:
o 80
to90ppm ofNox
o 1 to 1,5 of CO
Present owner confirms that
the gas turbine already completed the second major overhaul before the end of commercial operation.
1 x 23 MW Ansaldo Steam
Turbine, model CDI 635 R
1 x 23 MVA Alstom Generator
(for ST), model GSCR – 1000 Z4 Steam turbine accumulated 108.906 firing Hours.
DCS Control System for thermal plant (boiler and steam
turbine) ST cross section is reported below: 2 x Gas Compressors
|
|
Power Plant is also equipped with two alternative compressors model
2HM/1, for natural gas: one compressor able to boost the pressure from the 11
-12 bars of the pipeline up to 19,5 Bars required for the correct operation of
the gas turbine.
Second compressor works in stand by mode, to
replace the first in case of failure or maintenance. If both compressors work
simultaneously, they are able to boost gas pressure from 5 bars up to 19,5 Bars. Below pipeline pressure of 5
Bars, the two compressors trip.
Both Compressors
are powered by electrical motors.
PLANT PHOTOGRTAFIC
DOCUMENTATION
|
|
Img 1. Compressors room
|
|
Img 2. Steam Pipeline Img 3. External view of the plant Img 4. External view of the plant Img 5. Gas
turbine air filter chamber
|
|
|
|
|
|
|
|
Img 6. Demi-water
tanks Img 7. External view of the
transformers Img 8. External view of
the transformers
|
|
|
|
|
|
Img
9. Turbine control server
Img 10. Control room
|
|
Img 11. Control
room
|
|
.................