SECOND - HAND POWER - PLANTS

 

 2 (4) x 125 mw, 50 Hz, Dual Fuel Siemens 701D

Rebuilt ---full warranty on additional cost.* These can be modified for HFO use.

Gas Turbine Package -Simple Cycle Scope of Supply The existing used Gas Turbine Package includes the following major assemblies for each of four GT units:

1. Gas Turbine (701D)

                    GT engine

                    Dual Fuel Std. Combustion System

                    Turbine Bearing Fire Fighting

                    On Board I&C Devices

                    On Board Air Cooling System

                    On Board Bypass System

                    GTLS Special Tools (one set for four GTLS)

 

2. Generator (ABB)

                    Hydrogen cooled Generator (excitation system included)

                    Rotor Jacking oil system

                    Hydrogen oil sealing system

                    Generator Assembly Special Tools (one set for four units)

 

3. Control Package:

                    Vibration monitoring system (Bently Nevada)

                    Gas Detection System (MSA)

                    Fire protection board (Ciodue)

 

4. Electrical Package:

                    Motor control center

                    6 kV board

                    Generator protective relay panel

                    Battery charger with batteries and inverter

                    Auxiliary Transformer

                    Insulated bus bar duct

                    Generator Circuit Breaker

                    Excitation board

                    Excitation transformer

                    Lighting board

 

5. Starting Package:

                    Static Frequency Converter (2 packages for 4 power islands)

                    Barring Gear

 

6. Inlet Air System:

                    Filter Room

                    Inlet Manifold

                    Inlet Silencer

 

Schedule A

7. Exhaust System:

                    Horizontal Diffuser

                    Silencer

                    Vertical Stack

                    Diverter box

                     

                    8. Mechanical Package:

                    Common lube oil system for the gas turbine and generator

                    Atomizing and instrument air system

                    Cooling air system

                    Gas fuel system skid

                    Liquid fuel system skid

                    Cooling water skid

                    Water injection skid

                    Liquid fuel forwarding skid

 

9. Cooler Assemblies

                    Air-to-air cooler for rotor cooling

                    Oil-to-water cooler for lube oil cooling

                    Water-to-air for water cooling system

 

10. Firefighting System

                    GT Enclosure

                    Turbine Bearing

                    Mechanical Package Enclosure

 

11. Enclosures with Ventilation and Lighting System

                    Gas Turbine Module

                    Generator (only a shed)

                    Mechanical Package

                    Electrical Package

                    Control room

                    Battery and DC distribution room

 

1.      Emergency diesel generators (2 packages for 4 power islands) with relevant boards

2.      GT Pipe Rack Assemblies

3.      Bridge Crane (one serving four units) Documentation

 

�.                   Layouts, P&I drawings, Single Line Diagram (as available on site)

�.                   O&M manuals (as available on site)

 

Terminal Points

The used Gas Turbine Package is delimited by the following boundaries:

Schedule A

1.      Natural gas: @ inlet flange of the Gas Skid in the mechanical packages;

2.      Diesel Fuel Oil: @ inlet flange of GT injection skid;

3.      15kV: Insulated Bus Bar Duct Terminals

4.      l&C interconnection: @ marshalling box at the supplied equipment.

5.      Other Utilities: (e.g. water etc): @ inlet flange at the supplied equipment.

6.      Pipe rack: @ boundary of the power island.

 

Exclusions

The following equipment, systems and connections, necessary in order to operate the power plant, are excluded by scope of supply:

Pipes with diameter ≤ 2”

Cables, conduits and cableways Control Systems Valves, fittings, pipes, cables, structures and any other material of any kind outside terminal points; Communication systems Fire-fighting system(s) apart GT bearing, GT and mechanical enclosures Gas reducing/Compression station Tank and tank farm Fuel oil transfer from tank to forwarding skid Fuel oil treatment system Fuel oil unloading bay system Electrical substation Ancillary buildings (e.g. warehouse, workshop etc.) with relevant equipment Lighting system outside the existing GT power island boundary Lightning system Embedded systems and materials (e.g. oily and rainy water; raw, potable and demi water; sewage; cathodic protection; earthing grid etc.) Water treatment plants (e.g. raw, potable, oily, demi etc.) Hydrogen storage and/or production system DCS for power plant control Power plant electrical system supply Black start system HV and I&C interconnection to HV substation Any kind of modification request to comply with new site design conditions, norms, codes, local laws etc.

Power Plant Site Design Conditions

(the following information are not binding and provided for information only) Seismic acceleration: S = 9 (1) Wind pressure: 1000 N/m2 Snow load: 900 N/m2 Relative humidity: 100% Min. Temperature: -10°C

Schedule A

Max. Temperature: 40°C Quality of atmosphere: Industrial Note (1): This value corresponds to the seismic class of site according to relevant standards. This category has a peak seismic acceleration of 0.07g

Power Plant Performance (according to original installation figures)

(the following information are not binding and provided for information only) Power Output 122,700 kW Heat Rate 2,680 kCal/kWh (ISO conditions, New and Clean conditions, Base Load, Dry, Natural Gas, with GT Auxiliaries only)

These units were originally built by Fiat. Subsequently, they were totally rebuilt by Siemens and rename-plated by them as 701 units.

That can be provided for approx. 1 million USD each or a service contract can be arranged.