logo1.gif

 

Circular  July 2008

 

Gas Turbine (G 24 heavy fuel oil/ crude oil), Generator (40 MVA) 

now only 8 units left!!

This offer provides for the delivery of Power Plant Equipment with currently 12 (now only 8 units left!!) units of 25 MW electrical output each. The minimal offer consists of the supply of 4 groups, each including Gas Turbine (G 24 heavy fuel oil/ crude oil), Generator (40 MVA) and related auxiliary equipment.

 1.   Technical Data

1.1 Performance Data per Equipment Group 

· Design                                                 heavy duty, easy to maintain

· Electrical Output                                 ~ 25 MW

· Efficiency                                            ~ 24 %

· Turbine Inlet Temperature                  750 ° C

· Turbine Outlet Temperature               340 ° C

· Generator Voltage                               10.5 kV

· Frequency                                           50 Hz

· Fuel Consumption                               ~ 9.3 t/ h

· Calorific Value of Oil                           ~ 40 000 kJ/ kg 

 

        Fuel 

· Liquid Fuel                                     Heavy Fuel Oil/ Crude Oil

 

        Generator 

· Output                                                       40 MVA

· Speed                                                        3 000 RPM

· Voltage                                                      10.5 kV

· Enclosure                                                  IP 54 ICW 37

· Insulation System                                     F

· Excitation                                                  static

 

        Start-up Motor 

· Output                                                       2.5 MW

· Voltage                                                      6.3 kV

 

        Main Transformer 

· Output                                           40 MVA

· Voltage                                          10.5/ 6.3 kV

110 kV

        Auxilaries 

·           Lubrication System

·           Control System

·           Instrumentation

·           Fuel System

·           Electrical Equipment

·           Spare Parts

 

        Additional Data 

·           NOx Emission                         < 500 ppm

·           Manufacturer                          Bergmann- Borsig Berlin

·           Number of Machines              6

·           Location                                  Germany

·           Operating Time                       average 4 000 h

·           Starts                                       average 2 000

·           Time for Dismantling              ~ 1 month

·           Time for Shipment                  depending on new Site

·           Time for Erection                    ~ 3 months

·           Layout                                     located on Steel Foundation in a Power House

·           Weight                                     ~ 350 t

  

2.   Commercial Data

 

2.1 Basic Equipment 

Gas Turbine and Generator (approx. 3 000 h) together with

Auxiliary Equipment as per Technical Data Description              2.70 Mio € each

 

2.2 Scope of Services 

2.2.1 Test/ Dismantling/ Packing 

Expertise and Electrical Test of Generator

Dismantling, Packing for Seafreight

Transport and Insurance to German Port                                    0.800 Mio € each

 

Time required for dismantling, packing and transport to

German harbour approx. 6 weeks for 4 Units.

 

2.2.2 Maintenance Issues 

New Air Filters

Noise Dampers

Stacks

State of the Art I&C/ New Turbine Controller (no Control Room)

Fuel Heating Device   

Price 1.480 Million Euro each ---  PRICE NEGOTIABLE!!

 

 

Best regards

CH Non-Food Import-Export Corporation

Peter Pressmar (CEO)

Skype: peterpressmar

British Virgin Islands

Phone: +1 206-201-2420

Fax:     +1 206-337-0754

Phone Brazil: +55 21 3521-7225

mailto:office6@ch-non-food.com

http://www.ch-non-food.com/