Dear Sir

subject to prior sale we can offer

 

We are informed that a deposit for the 250 mw plant below

is expected very soon so if there is any serious

interest it would be the right time to act now !!!

 

250 MW Oil fired power station.

The plant is unused and in excellent condition

250 MW station comprising a single steam generator/steam

turbine-alternator unit, designed to burn heavy fuel oil.

YOM 1975 and completed in 1979

The sudden unexpected and rapid rise in the price of oil in the 1970's,

and a less than forecast demand for power, a decision

was made to place the station in long term storage.

 

Maker : Mitsubishi Heavy Industries Ltd, Japan

Serial Number : T-602

Type : Three casing, tandem compound, double flow, condensing, single reheat.

Speed : 3,000 rpm

Nominal Rating : 250,000 kW

Steam Conditions at Turbine Stop Valves -

Pressure : 124 barg

Temperature : 538C

Steam Flow (max) : 748,660 kg/h (786,093 kg/h design)

Number of Extractions : Six (6)

Number of Stages : Fifty-five (55)

Overall Length of Unit : 34 metres

Overall Width of Unit :

8.5 metres Height of unit above

Floor line : 5.0 metres

Design steam conditions are 124 bar gauge and 538C at the turbine stop valves.

Reheat temperature is 538C and the design exhaust pressure is 74 mbar absolute.

The nominal rating of the unit is 250,000 kW at a guaranteed steam flow rate of 748,660 kg/h

hrough the stop valves at 124 bar gauge main steam pressure and 76 mbar absolute back pressure. We understand it cost US $333 million to construct

 

A full set of instruction and operation manuals are included Scope available

An Indian Company that specialises in the dismantling and re-assembly of this type of equipment

has already visited the site and is familiar with the requirements to relocate it.

 

Price ON SERIOUS REQUEST ONLY

 

******************************************************************************************

 

Rolls Royce RB211

Peebles Generator Brushless 35,000 kVA

Air intake structure (filters will need to be changed)

Turbine fin-fan cooler

Exhaust stack

Air emission monitoring building and equipment

Control system

Two air compressors

Building air conditioner

UPS system

Fuel gas compressor

All MCC and electrical control cabinets and switchgear.

Price 11.5 Million USD

 

******************************************************************************************

 

Four GE 7EA's brand new (gas fired)

 in crates with stacks and for an extra cost GEA fin-fan coolers.

Cost of CT and stack is 21.9 Million USD each, ready for delivery.

The 4 are almost sold

We still have Two (2) that are available @ $ 25 Million EACH 

 

******************************************************************************************

 

ONE ( 1 ) Used  low hour 100 Mw Coal Fired Powerplant

STG Sets Complete With Boiler Plant

Scope Of Supply

Fuel:                 Fired On Either Pulverized Coal Or Fuel Oil

Cycle:               50Hz

Rated Output:   100 Mw Each Unit

Operating Hours                        144000

First Commissioned:     1968

Condition:         Excellent

Fuel:                Pf Coal Or HFO (Or Gas)

Boilers:            Ce And Mitchell, Ta Sets Are Aeg Germany

Operating Pressure:                   1275 PSIG.

Final Steam Temperature:          965F

For Condenser, And Piping For Feed-Water Heating System Available Complete With Valves, Condensate Extraction Pumps, Cooling Water Pump And Valves, Transformer 110 Mva, 300000 Hv, 15000 Lv. +- 5%

Manuals

Manufacturers Original Data (Catalogue) Manuals Including Drawings

Steam Turbine Performance And Characteristics Manuals

 

Plant Comes Complete With:

Buildings

O/H Crane For Turbine Hall Etc

Specific Steam Consumption Of Turbine:           4 Kg / 1 Kwh

Operating Pressure:                   1275 Psig. / 965 F

Steam Consumption/Required Pressure: 82 Barg Hp Inlet Steam, 525 Deg. C, 4,1 Kg Steam / Kwh, In

 

The plant was kept mothballed under supervision for start-up since 91; there was a serious drought in the area which left the plant without cooling water for the condensers. Once the water situation improved, the supply of power from the smaller power stations was no longer required at the time since the big stations (up to 4800 MW) were running on ECR. (Economical Cont. Rating). In 1999 the decision was made to sell, first to local interested parties, later to overseas prospects.

 

The equipment has been professionally laid up.

 

Price:  $ 7.5 millon USD

Still installed, removal & install not inluded.

 

 

******************************************************************************************

 

New, never used 1250 mw ABB Steam Turbine plants

Two each 1250 MW = 2500 MW in total.

This does not include any boilers for Steam production.

This is very large units.

Price is $ 36 million each,

Plus $ 9.5 million for removal

More info with LOI and BCL

 

******************************************************************************************

 

LM 2500

new in 1990 

began operation in 1991 

model 7 lm2500pe-mlwg03  s/n  4 xx- xx 2x

rated output (15 c )  22.6 mw

powerfactor 0.85

output voltage 11 kw

turbine air flow 1200000 cfm  egt control 1510f

dual fuel : gas addition was completed in june 2005

control system upgraded to micronet digital  ( 2005)

size 22.95 m (l) x 5.98 m (w ) x 9.3 m ( h)

total weight  162.2 tons

usage total starts since new 4340

overhaul intervals cold section componens 50000 hours

overhaul history:

2001 overhauled and operated 14000 hours

2004/2005   hot section exchange by ge, and operated ony 684 hoursExhaust not included

PRICE  7.5 Million US$

 

******************************************************************************************

 

Pratt & Whitney model FT-8 27.4 MW 50 hz 

in addition to the LM 2500,  at the same location

Both the Lm2500 & the FT-8 have exhaust HRSG for sale if interested.

 

Technical Data – P & W FT 8 Gas Turbine Power Plant

Time since last overhaul 1653 hours

Gas Turbine Model                 : FT8 Powerpac

Manufacturer                          : Pratt & Whitney

No. of units                             : 1

Commercial Operation Date   : March 1992

Total Hours Since New                       : 55093 Fired Hours, 4903 Starts

                                                 Time since last overhaul 1653 hours

ISO Rating                              : 27.404 MW, 35.63 MVA

Heat Rate                                : 9269 BTU/kW-hr

Control System Manufacturer            : GE Micronet (installed January 2005)

Generator Manufacturer         : Brush Electrical Machines Ltd, USA

Generator Type                       : Brushless Excitation, 11.5  kV, 50 Hz

Fuel Type                                : Dual Fuel (Diesel and Gas)

Year of Manufacture              : 1991

Starting System                       : Air

Water Injection                                   : Installed water injection Nox control system

Current Status                         : Unit is still installed

The complete power plant is available to be sold including all equipment which is required for electrical generation,

  .

******************************************************************************************

 

One(1) complete unit of 30 MW Gas Turbine set, Combined Cycle

·       Consisting of GE Made Heavy duty Combined Cycle Gas Turbine unit with all associated auxiliaries equipments in good condition with 11 kV at 50 Hz.

·       Total Capacity          approx. 30 MW (GT 22.6 MW + STG 6.8 MW)

·       Type                                    LM2500

·       Fuel                         Heavy Fuel Oil / Natural Gas

·       Total Running Hours approx. 55000

·       Year of Operation     1991 (for Simple Cycle operation)

 

One(1) complete unit of 33 MW Gas Turbine set, Combined Cycle

·       Consisting of P & W Made Heavy duty Combined Cycle Gas Turbine unit with all associated auxiliaries equipments in good condition with 11 kV at 50 Hz.

·       Total Capacity          approx. 33 MW (GT 26.45 MW + STG 6.8 MW)

·       Type                                    FT8

·       Fuel                         Heavy Fuel Oil / Natural Gas

·       Total Running Hours approx. 55000

·       Year of Operation     1992 (for Simple Cycle operation)

 

Price Indication (for the 2 GT's):

- Gas Turbines : US$ 12.8 Million as is where is in China

- Dismantling, Packing, Local transport to the nearest port : US$ 950 K

- Insurance, Ocean Freight cost to the Destination : Depending on the Destination. However, they estimated approx. U$1.4~1.5 M for the 2 GT's

- Turn-key : We should check if available.

 

******************************************************************************************

 

26.4 MW Sulzer HFO Power Plant, 50/60 Hz

(6) x Model: 6Z40/48, 3300 kW (Engine no. 1 – 6)

(2) x Model: 12Z40/48, 6600 kW (Engine no. 7 – 8)

600 rpm

50/60 Hz

Fuel: : Diesel or HFO.

One 12Z40/48 set is for parts

HFO heating plant and all auxiliaries are included.

 

Power Plant Technical Data

 

Engine 1 - 6

Engine 7 - 8

Remarks

Manufacturer

SULZER

SULZER

 

Model Engine

6 ZL 40/48

12ZV4048

 

YOM

1987

1986

 

Power per Engine

3300 kW

6600 kW

 

Speed

600 rpm

600 rpm

 

Fuel

Gas-Oil or HFO 380 Cst.

 

Frequency

50/60 Hz

 

 

Condition

Used

Used

 

 

 

 

 

Remarks

 

1 set for parts

 

They were stored in a dry protected place.

Engine Nº 7 - SULZER 12ZV4048 is broken. It is only suitable for spare parts.

 

Alternators

Brand: Rade Koncar

3800 kVA, 6600 kV, 600 rpm.

 

Running Hours/Overhauls

Engine Nº 1 - Total Running Hours: 33.826 / General Overhaul: 31.737, Motor OK

Engine Nº 2 - Total Running Hours: 34.974 / General Overhaul: 33.600, Motor OK

Engine Nº 3 - Total Running Hours: 36.167 / Overhaul: 17.010

Engine Nº 4 - Total Running Hours: 36.707 / Overhaul: 20.155

Engine Nº 5 - Total Running Hours: 34.522 / Overhaul: 25.100

Engine Nº 6 - Total Running Hours: 36.824 / Overhaul: 19.800

Engine Nº 7 - Block and Crankshaft are broken. For spare parts only.

Engine Nº 8 - Total Running Hours: 14.902 / General Overhaul: 12.426, Motor OK).

* Engine no. 3, 4, 5, 6 are working but expecting General Overkaul

 

Type of Engine Cooling System

6 engines ->   6 cylinders, working with tower cooling

2 engines -> 12 cylinders, working with air cooling

HFO heating plant and all auxiliaries are included

 

Price 2 Million

 

******************************************************************************************

120 Mva SIEMENS GAS TURBINE PLANT
Offered out as overhauled with warranty - Hfo  as  prime fuel

 

Complete Gas turbine Power Plants each consisting of One  Siemens gas turbine and all relevant auxiliaries in excellent condition, fully operable, ready for immediate delivery.

·     Currently on liquid fuel

Description of  Gas Turbine Generators

            Siemens V94.2 heavy-duty gas turbine. rated output of 105 MW at ISO conditions.

The GT unit is of single-shaft, single casing design, equipped with 2 silo-type combustion chambers, a 16-stage compressor and a 4-stage turbine. An air-cooled generator, rated at 125 MVA and generating at 10.5 kV is driven from the cold (compressor) end of the GT unit.

GT1  Scope of Asset Sale
1      Equipment and Systems
The following equipment, auxiliary and ancillary systems will form part of the scope of the asset sale:

·     Gas Turbine Unit:

o         GT thermal block.

o          GT associated fire protection and detection system / gas leak detection system.

o          GT instrumentation and controls.

o          GT monitoring and protection system.

o          GT control valve block.

o          GT starting motor and torque converter system.

o          GT DC system with battery and charger.

o          Ignition system.

o          Fuel firing system (for distillate-oil liquid fuel).

o          Lubrication oil system and lubricating oil-radiator coolers.

o          Control oil system.

o          On-line compressor cleaning system.

o                Off-line compressor cleaning system.

o                Air intake and filter system with silencers and self-cleaning elements.

o                Exhaust gas stack, exhaust gas ducting, silencers, expansion joints, aviation obstruction warning lights and lightning arrestors.

 

·     For each GT Generator Unit:

 

o                Generator with air-cooling, including generator main connections, generator circuit breaker, isolated phase bus-ducts and auxiliary switchgear.

o          Static frequency converter system.

o          Static excitation system with automatic voltage regulation control.

o                Lubricating-oil system and lubricating oil-radiator coolers.

o          Generator cooling system.

o          Generator associated control, instrumentation, metering and protection system.

o          Generator terminal enclosure.

o          Internal piping and cabling integral to the unit.

o          Neutral grounding transformers/resistors.

 

·     Transformer Unit:

 

o                Unit transformer (10.5 kV to 6 kV).

o          Associated protection, control and instrumentation system.

o         

 

·     Mechanical Auxiliary and Ancillary Systems:

 

 

o             Fire fighting system, including diesel engine and electrically driven fire pumps, water storage tank and foam storage tank.

o          Fire detection and alarm system.

o          Black-start diesel generator and black-start air-compressor.

o          Compressed air system, including compressors and receivers.

o          Turbine hall overhead cranes.

 

·     Electrical Auxiliary and Ancillary Systems:

 

o             One (1) station transformers (22kV to 6kV).

o          One (1) auxiliary transformers (6kV to 3.3kV).

o          One (1) frequency converter transformers (6kV to 1400V).

o          One (1) exciter transformers (6kV to 500V).

o          One (1) low voltage transformers (6kV to 380V).

o          One (1) off-site system transformer (3.3kV to 415V).

o          66kV switchgear for interconnection to electricity grid.

o          22 kV switchgear for station auxiliary voltage system.

o          6 kV switchgear for station auxiliary voltage system.

o          3.3 kV switchgear for station auxiliary voltage system.

o          380 V switchgear for station auxiliary voltage system.

o          380V switchgear for station auxiliary power system.

o          220V switchgear for station auxiliary power system.

o          24V switchgear for station auxiliary power system.

o          220 V DC system including chargers and batteries.

o          24 V DC system including chargers and batteries.

o          Associated protection, control and instrumentation system.

 

·     Instrumentation and Control Auxiliary and Ancillary Systems:

 

o             Siemens Iskamatic control and protection system for GT unit.

o          Vibration monitoring system for GT units.

o          Ronan Sequential Event Recording (SER) system.

o          Electro hydraulic Control System for GT units.

o          Station CCTV System.

 

2.   Special Tools

·     Special Tools

Gas Turbine Special Tools

o                One (1) generator skid.

o          One (1) generator trolley.

o          One (1) set generator rotor support (consisting of two pieces).

o          One (1) GT turbine lifting beam.

o          One (1) GT turbine bearing shaft support.

o          One (1) set GT compressor casing transportation I-beam (consisting of two pieces).

o          One (1) GT compressor bearing shaft support.

o          GT combustion chamber supports.

o          Up-ending clamps.

 

3.         Documentation

 

The following documentation will be included in the scope of the asset sale:

 

·     Operation and Maintenance Manuals.

 

Price   ON SERIOUS REQUEST

OVERHAULED WITH WARRANTY.

 

******************************************************************************************

More than a half Dozen of Prospects awaiting Proof of Funds daily but still available:

 

Cement Plant  - One Million Metric Tonnes Per Annum

The plant consists of Primary Crushers, Secondary Crushers, Impacters and Screens.Clinker Plant consisting of 5 Kilns, working on Dry Process.Cement Grinding plant and a packing plant . Plant will be supplied at sellers cost only after providing current (2007) technology /upgrades

    –New Electricals (50 / 60 Hz operation available at buyers option)

    –New electronics and computerised operational capability

    –New combustion equipment

    –New Instrumentation

    –Written guarantee for satisfactory working of the plant

    •Capacity:One Million MT Per year of Ordinary Portland Cement

    •Location:

    •Manufacturer : Allis Chalmers / Fuller

    •Year of Mnfr:1975

    •Year of Idling: 1982

    •Fuels handled: Coal, Gas, & Oil

    •Process:Dry Process

    •Condition:Excellent.

    •Residual life:50 years ( estimated subject to satisfactory maintenance and proper usage)

    •Engineering :Full set of plant Engg drawings and details are available at no extra cost.

    •CIF Price *:

    –Complete Plant US$ 27.0 Million CIF *

    –Clinker plant only US$ 22.5 Million *

    •Erection & commissioning:    –Not Included

    •Operational Management:     –Prices available on request

 

    •Cost of an Equivalent new plant from same manufacturers will be approximately US$ 180 Million .     •We can also provide all necessary Engineering and support for erection and commissioning of the plant. Our support partners are approved by World Bank , IFC Washington, ICICI, IDBI etc.