Dear Sir
subject to prior sale we can
offer
We are informed
that a deposit for the 250 mw plant below
is expected very
soon so if there is any serious
interest it
would be the right time to act now !!!
250 MW Oil fired power
station.
The plant is
unused and in excellent condition
250 MW station
comprising a single steam generator/steam
turbine-alternator
unit, designed to burn heavy fuel oil.
YOM 1975 and
completed in 1979
The sudden
unexpected and rapid rise in the price of oil in the 1970's,
and a less than
forecast demand for power, a decision
was made to place
the station in long term storage.
Maker :
Mitsubishi Heavy Industries Ltd, Japan
Serial Number :
T-602
Type : Three
casing, tandem compound, double flow, condensing, single reheat.
Speed : 3,000 rpm
Nominal Rating :
250,000 kW
Steam Conditions
at Turbine Stop Valves -
Pressure : 124
barg
Temperature :
538C
Steam Flow (max)
: 748,660 kg/h (786,093 kg/h design)
Number of
Extractions : Six (6)
Number of Stages
: Fifty-five (55)
Overall Length of
Unit : 34 metres
Overall Width of
Unit :
8.5 metres Height
of unit above
Floor line : 5.0
metres
Design steam
conditions are 124 bar gauge and 538C at the turbine stop valves.
Reheat
temperature is 538C and the design exhaust pressure is 74 mbar absolute.
The nominal
rating of the unit is 250,000 kW at a guaranteed steam flow rate of 748,660
kg/h
hrough the stop
valves at 124 bar gauge main steam pressure and 76 mbar absolute back pressure.
We understand it cost US $333 million to construct
A full set of
instruction and operation manuals are included Scope available
An Indian Company
that specialises in the dismantling and re-assembly of this type of equipment
has already
visited the site and is familiar with the requirements to relocate it.
Price ON SERIOUS REQUEST
ONLY
******************************************************************************************
Rolls Royce RB211
Peebles Generator
Brushless 35,000 kVA
Air intake
structure (filters will need to be changed)
Turbine fin-fan
cooler
Exhaust stack
Air emission
monitoring building and equipment
Control system
Two air
compressors
Building air
conditioner
UPS system
Fuel gas
compressor
All MCC and
electrical control cabinets and switchgear.
Price 11.5
Million USD
******************************************************************************************
Four GE 7EA's brand new (gas fired)
in crates with stacks and for an extra cost
GEA fin-fan coolers.
Cost of CT and stack is 21.9
Million USD each, ready for delivery.
The 4 are almost
sold
We still have Two (2) that
are available @ $ 25 Million EACH
******************************************************************************************
ONE (
1 ) Used low hour 100 Mw Coal Fired
Powerplant
STG Sets Complete With Boiler Plant
Scope Of Supply
Fuel: Fired On
Either Pulverized Coal Or Fuel Oil
Cycle: 50Hz
Rated Output: 100 Mw Each Unit
Operating Hours 144000
First Commissioned: 1968
Condition: Excellent
Fuel: Pf Coal Or HFO
(Or Gas)
Boilers: Ce And
Mitchell, Ta Sets Are Aeg Germany
Operating Pressure: 1275
PSIG.
Final Steam Temperature: 965F
For Condenser, And Piping For Feed-Water Heating System Available
Complete With Valves, Condensate Extraction Pumps, Cooling Water Pump And
Valves, Transformer 110 Mva, 300000 Hv, 15000 Lv. +- 5%
Manuals
Manufacturers Original Data (Catalogue) Manuals Including Drawings
Steam Turbine Performance And Characteristics Manuals
Plant Comes Complete With:
Buildings
O/H Crane For Turbine Hall Etc
Specific Steam Consumption Of Turbine: 4
Kg / 1 Kwh
Operating Pressure: 1275
Psig. / 965 F
Steam Consumption/Required Pressure: 82
Barg Hp Inlet Steam, 525 Deg. C, 4,1 Kg Steam / Kwh, In
The plant was kept mothballed under supervision for start-up since 91; there was a serious drought in the area
which left the plant without cooling
water for the condensers. Once the water situation improved, the supply of power from the smaller power
stations was no longer required at
the time since the big stations (up to 4800 MW) were running on ECR. (Economical Cont. Rating). In
1999 the decision was made to sell,
first to local interested parties, later to overseas prospects.
The equipment has been professionally laid up.
Price: $ 7.5 millon USD
Still installed, removal & install not inluded.
******************************************************************************************
New, never used 1250 mw ABB Steam Turbine plants
Two each 1250 MW = 2500 MW in
total.
This does not include any
boilers for Steam production.
This is very large units.
Price is $ 36 million
each,
Plus $ 9.5 million for
removal
More info with LOI and BCL
******************************************************************************************
LM 2500
new in 1990
began operation in 1991
model 7 lm2500pe-mlwg03 s/n 4
xx- xx 2x
rated output (15 c ) 22.6 mw
powerfactor 0.85
output voltage 11 kw
turbine air flow 1200000
cfm egt control 1510f
dual fuel : gas addition was
completed in june 2005
control system upgraded to
micronet digital ( 2005)
size 22.95 m (l) x 5.98 m (w
) x 9.3 m ( h)
total weight 162.2 tons
usage total starts since new
4340
overhaul intervals cold
section componens 50000 hours
overhaul history:
2001 overhauled and operated
14000 hours
2004/2005 hot section exchange by ge, and operated ony
684 hoursExhaust not included
PRICE 7.5 Million US$
******************************************************************************************
Pratt & Whitney model FT-8 27.4 MW 50 hz
in addition to the LM
2500, at the same location
Both the Lm2500 & the
FT-8 have exhaust HRSG for sale if interested.
Technical Data – P & W
FT 8 Gas Turbine Power Plant
Time since last overhaul 1653
hours
Gas Turbine Model : FT8 Powerpac
Manufacturer : Pratt & Whitney
No. of units : 1
Commercial Operation
Date : March 1992
Total Hours Since New : 55093 Fired Hours,
4903 Starts
Time since last overhaul 1653 hours
ISO Rating : 27.404 MW,
35.63 MVA
Heat Rate : 9269
BTU/kW-hr
Control System
Manufacturer : GE Micronet
(installed January 2005)
Generator Manufacturer : Brush Electrical Machines Ltd, USA
Generator Type : Brushless Excitation,
11.5 kV, 50 Hz
Fuel Type : Dual Fuel (Diesel and Gas)
Year of Manufacture : 1991
Starting System : Air
Water Injection : Installed
water injection Nox control system
Current Status : Unit is still installed
The complete power plant is
available to be sold including all equipment which is required for electrical
generation,
.
******************************************************************************************
One(1)
complete unit of 30 MW Gas Turbine set, Combined Cycle
·
Consisting of GE Made Heavy duty Combined Cycle Gas
Turbine unit with all associated auxiliaries equipments in good condition with
11 kV at 50 Hz.
·
Total Capacity approx.
30 MW (GT 22.6 MW + STG 6.8 MW)
·
Type LM2500
·
Fuel Heavy
Fuel Oil / Natural Gas
·
Total Running Hours approx.
55000
·
Year of Operation 1991
(for Simple Cycle operation)
One(1)
complete unit of 33 MW Gas Turbine set, Combined Cycle
·
Consisting of P & W Made Heavy duty Combined Cycle
Gas Turbine unit with all associated auxiliaries equipments in good condition
with 11 kV at 50 Hz.
·
Total Capacity approx.
33 MW (GT 26.45 MW + STG 6.8 MW)
·
Type FT8
·
Fuel Heavy
Fuel Oil / Natural Gas
·
Total Running Hours approx.
55000
·
Year of Operation 1992
(for Simple Cycle operation)
Price Indication (for the
2 GT's):
- Gas Turbines : US$ 12.8
Million as is where is in China
- Dismantling, Packing,
Local transport to the nearest port : US$ 950 K
- Insurance, Ocean Freight
cost to the Destination : Depending on the Destination. However, they estimated
approx. U$1.4~1.5 M for the 2 GT's
- Turn-key : We should check
if available.
******************************************************************************************
26.4 MW Sulzer HFO Power Plant,
50/60 Hz
(6) x Model:
6Z40/48, 3300 kW (Engine no. 1 – 6)
(2) x Model:
12Z40/48, 6600 kW (Engine no. 7 – 8)
600 rpm
50/60 Hz
Fuel: : Diesel or
HFO.
One 12Z40/48 set is
for parts
HFO heating plant
and all auxiliaries are included.
Power Plant
Technical Data
|
|
Engine 1 - 6 |
Engine 7 - 8 |
Remarks |
|
Manufacturer |
SULZER |
SULZER |
|
|
Model Engine |
6 ZL 40/48 |
12ZV4048 |
|
|
YOM |
1987 |
1986 |
|
|
Power per Engine |
3300 kW |
6600 kW |
|
|
Speed |
600 rpm |
600 rpm |
|
|
Fuel |
Gas-Oil or HFO 380 Cst. |
|
|
|
Frequency |
50/60 Hz |
|
|
|
Condition |
Used |
Used |
|
|
|
|
|
|
|
Remarks |
|
1 set for parts |
|
They were stored in
a dry protected place.
Engine Nº 7 -
SULZER 12ZV4048 is broken. It is only suitable for spare parts.
Alternators
Brand: Rade Koncar
3800 kVA, 6600 kV,
600 rpm.
Running
Hours/Overhauls
Engine Nº 1 - Total
Running Hours: 33.826 / General Overhaul: 31.737, Motor OK
Engine Nº 2 -
Total Running Hours: 34.974 / General Overhaul: 33.600, Motor OK
Engine Nº 3 -
Total Running Hours: 36.167 / Overhaul: 17.010
Engine Nº 4 -
Total Running Hours: 36.707 / Overhaul: 20.155
Engine Nº 5 -
Total Running Hours: 34.522 / Overhaul: 25.100
Engine Nº 6 -
Total Running Hours: 36.824 / Overhaul: 19.800
Engine Nº 7 -
Block and Crankshaft are broken. For spare parts only.
Engine Nº 8 -
Total Running Hours: 14.902 / General Overhaul: 12.426, Motor OK).
* Engine no. 3, 4,
5, 6 are working but expecting General Overkaul
Type of Engine
Cooling System
6 engines
-> 6 cylinders, working with tower cooling
2
engines -> 12 cylinders, working with air cooling
HFO heating plant
and all auxiliaries are included
Price 2
Million
******************************************************************************************
120
Mva SIEMENS GAS TURBINE PLANT
Offered out as overhauled with warranty - Hfo as
prime fuel
Complete Gas turbine Power Plants each consisting of One Siemens gas turbine and all relevant
auxiliaries in excellent condition, fully operable, ready for immediate
delivery.
· Currently on liquid fuel
Siemens
V94.2 heavy-duty gas turbine. rated output of 105 MW at ISO conditions.
The GT unit is of single-shaft, single casing design, equipped with 2
silo-type combustion chambers, a 16-stage compressor and a 4-stage turbine. An
air-cooled generator, rated at 125 MVA and generating at 10.5 kV is driven from
the cold (compressor) end of the GT unit.
GT1
Scope of Asset Sale
1 Equipment and Systems
The following equipment, auxiliary and ancillary systems will form part of the
scope of the asset sale:
· Gas Turbine Unit:
o
GT thermal block.
o GT associated fire
protection and detection system / gas leak detection system.
o GT instrumentation and controls.
o GT monitoring and protection system.
o GT control valve block.
o GT starting motor and torque converter
system.
o GT DC system with battery and charger.
o Ignition system.
o Fuel firing system (for distillate-oil
liquid fuel).
o Lubrication oil system and lubricating
oil-radiator coolers.
o Control oil system.
o On-line compressor cleaning system.
o Off-line
compressor cleaning system.
o Air intake and
filter system with silencers and self-cleaning elements.
o Exhaust gas stack,
exhaust gas ducting, silencers, expansion joints, aviation obstruction warning
lights and lightning arrestors.
· For each GT Generator Unit:
o Generator
with air-cooling, including generator main connections, generator circuit
breaker, isolated phase bus-ducts and auxiliary switchgear.
o Static frequency
converter system.
o Static excitation system
with automatic voltage regulation control.
o Lubricating-oil
system and lubricating oil-radiator coolers.
o Generator cooling system.
o Generator associated control,
instrumentation, metering and protection system.
o Generator terminal enclosure.
o Internal piping and cabling integral
to the unit.
o Neutral grounding
transformers/resistors.
· Transformer Unit:
o Unit transformer
(10.5 kV to 6 kV).
o Associated protection, control and
instrumentation system.
o
· Mechanical Auxiliary and Ancillary Systems:
o Fire fighting system,
including diesel engine and electrically driven fire pumps, water storage tank
and foam storage tank.
o Fire detection and alarm system.
o Black-start diesel generator and
black-start air-compressor.
o Compressed air system, including
compressors and receivers.
o Turbine hall overhead cranes.
· Electrical Auxiliary and Ancillary Systems:
o One (1) station
transformers (22kV to 6kV).
o One (1) auxiliary transformers (6kV to
3.3kV).
o One (1) frequency converter
transformers (6kV to 1400V).
o One (1) exciter transformers (6kV to
500V).
o One (1) low voltage transformers (6kV
to 380V).
o One (1) off-site system transformer
(3.3kV to 415V).
o 66kV switchgear for interconnection to
electricity grid.
o 22 kV switchgear for station auxiliary
voltage system.
o 6 kV switchgear for station auxiliary
voltage system.
o 3.3 kV switchgear for station
auxiliary voltage system.
o 380 V switchgear for station auxiliary
voltage system.
o 380V switchgear for station auxiliary
power system.
o 220V switchgear for station auxiliary
power system.
o 24V switchgear for station auxiliary
power system.
o 220 V DC system including chargers and
batteries.
o 24 V DC system including chargers and
batteries.
o Associated protection, control and
instrumentation system.
· Instrumentation and
Control Auxiliary and Ancillary Systems:
o Siemens Iskamatic
control and protection system for GT unit.
o Vibration monitoring system for GT
units.
o Ronan Sequential Event Recording (SER)
system.
o Electro hydraulic Control System for
GT units.
o Station CCTV System.
2. Special Tools
· Special Tools
Gas Turbine Special Tools
o One (1) generator
skid.
o One (1) generator trolley.
o One (1) set generator rotor support
(consisting of two pieces).
o One (1) GT turbine lifting beam.
o One (1) GT turbine bearing shaft
support.
o One (1) set GT compressor casing
transportation I-beam (consisting of two pieces).
o One (1) GT compressor bearing shaft
support.
o GT combustion chamber supports.
o Up-ending clamps.
3. Documentation
The following
documentation will be included in the scope of the asset sale:
· Operation and Maintenance Manuals.
Price ON SERIOUS REQUEST
OVERHAULED WITH WARRANTY.
******************************************************************************************
More than a half
Dozen of Prospects awaiting Proof of Funds daily but still available:
Cement Plant -
One Million Metric Tonnes Per Annum
The plant consists of Primary
Crushers, Secondary Crushers, Impacters and Screens.Clinker Plant consisting of
5 Kilns, working on Dry Process.Cement Grinding plant and a packing plant .
Plant will be supplied at sellers cost only after providing current (2007)
technology /upgrades
–New Electricals (50 / 60 Hz operation
available at buyers option)
–New electronics and computerised
operational capability
–New combustion equipment
–New Instrumentation
–Written guarantee for satisfactory working
of the plant
•Capacity:One Million MT Per year of
Ordinary Portland Cement
•Location:
•Manufacturer : Allis Chalmers / Fuller
•Year of Mnfr:1975
•Year of Idling: 1982
•Fuels handled: Coal, Gas, & Oil
•Process:Dry Process
•Condition:Excellent.
•Residual life:50 years ( estimated subject
to satisfactory maintenance and proper usage)
•Engineering :Full set of plant Engg
drawings and details are available at no extra cost.
•CIF Price *:
–Complete Plant US$ 27.0 Million CIF *
–Clinker plant only US$ 22.5 Million *
•Erection & commissioning: –Not Included
•Operational Management: –Prices available on request
•Cost of an Equivalent new plant from same
manufacturers will be approximately US$ 180 Million . •We can also provide all necessary
Engineering and support for erection and commissioning of the plant. Our