Dear Sir
subject to prior sale we can supply
the list below does not show all we have and some offers from earlier circulars 2009 are still in place
please always let us know what circular and what number - (numbers change in each circular)


1.)   39 MW Combined Cycle with STG & HRSG
Gas Turbine PG6561B: Output :39 MW
Steam Turbine Output : 15 MW
10.5 kV, 50 Hz
Fuel : Gas (Can be converted to use Dual Fuel)
Start Operating : 2001
Total Running Hour : 31778 hours
Number of Start : 131
Steam Turbine total Running Hour : 29600 hours
Still installed and in operation in China
6.9 Million USD each

====================================================================

2.)   42 MW LM6000PA Simple Cycle Gas Turbine 50 Hz
Dual Fuel - Gas and/or Diesel Oil with rated Generating Power
Manufactured by the original S & S Company;
unit purchased by GE and was put into operation in December 1995
The Gas Conversion Project was completed by the end of 2004
The total generating hours are 11,000 hours, 3200 hours were operated by Gas.
Equipped with Air Inlet chilling/heating system which adjusts the tem. of the Gas
Unit comprehensively maintained once a year - last time in May of 2008
9.8 Million USD FAS Shanghai, China
but can be converted to 60HZ no problem
Total cost of Plant, including conversion: 10.2 Million USD.
Price includes Dismantling, Packing, Inland Transport to Shanghai port.

====================================================================

3.)   340 MW   -   4 x 84.4 MW Frame GE 7EA units 60 Hz
gas-fired, simple-cycle - could burn HFO with modification. 
Manufacturer General Electric
Model PG7121EA
Units installed in 2002 but never brought on line.
Have about 1000 hours.
Price 21.5 Million USD each (price is fixed - asked for commission)
Does not include cost to modify to HFO or fuel treatment system.

====================================================================

4.)   12.9 MW Cogenerator Plant  50 Hz, consisting of 10.3 MW Mars + 2.6 MW KKK
Used 12.9 MW Cogen Plant, in Combined Cycle with Gas Turbine,
Steam Boiler with Double Steam Drum,
Steam Turbine with Intermediate Extraction and Condensation.
Gas Turbine
(1) 10.3 MW Solar Model Mars-100 natural gas Turbo Generator (1997) with
Alsthom type AA58 BAL11-4P AC Generator And MAAG Type PF3-28 Gearbox.
Has Pulstar Air Intake with Filtration and 2-Trane 25 Bar Natural Gas Feed Station,
also Includes Waste Heat Bypass Vent.
Steam Turbine
(1) 2.6 MW Steam Turbo generator Set consisting of (1) Indar Extraction Turbine (1)
Kuhnle Kopp Kausch Type AFA6 G5A Condensing Turbine, (1) Stainless Steel Shell
and Tube Condenser and (2) Ingersol Rand type SSR Air Compressors.
Steam Boiler
(1) Steam Boiler which includes (3) Steam Receiver Vessels, Plate Heat
Exchangers, (2) Sulzer Type MC50-220/13 Boiler Feed Pumps with 12 Stage,
Intermediate Extraction at 40 Bar and Final Extraction at 90 Bar. Steam Boiler is
Recovery Type with two levels of Steam Pressure, capacity as follows: -
3.2 Ton/Hr 10.2 Barg Saturated Steam with post combustion
3.9 Ton/Hr 10.2 Barg Saturated Steam without post combustion.
22 Ton/Hr 62 Barg Saturated Steam with post combustion.
15.7 Ton/Hr 62 Barg Saturated Steam without post combustion.
16 Ton/Hr 61.5 Barg Superheated At 450 Deg C Steam (from 62 barg Saturated
Steam) with or without post combustion.
(1) 3.2MW Duct Burner.
(1) Water Treatment Plant which includes: Culligan Reverse Osmosis System,
Circulating and Vacuum Pumps, Stainless Steel and Plastic Storage Vessels, Sand
Filters and Controls.
(1) Cooling Tower with Associated Pumps
 (2) Electrical Transformers.
(1) Control System to operate the entire plant.
Price 2.9 Million USD

====================================================================
 
5.)   SOLAR TAURUS 60, 5000 kWe      
    Capacity    : 6000 KVA                  
    Type    :SOLAR TAURUS 60-7001                  
    Packager    : MAN                  
    Fuel Types    : Doğal Gaz - Motorin                  
    Control System    : Siemens, Simatic S5                  
    Commissioning Date    25.05.2009                  
    Total Operation Hours    139866                  
    Main Overhaull    GT Değişimi Yapıldı  (09/03/2004)                  
    Last Maintenance Date    06.04.2008                  
    Total Start Quantity    1007                  
    Op. Hours of the Changed Turbine    35800                  
    Start Qty. Of the Cahanged Turbine    298  
Price 895.000 USD.
be informed that the owner of the plant agreed with a service company for the major overhaul
they already paid 180.000 USD of the total 470.000 USD maintenance price, it is up to the
buyer whether continue and get a new refurbished turbine by this major overhaul or to cancel it.

====================================================================

6.)   Three Solar T 60 units   5.2 MW 50 hz
Trailer mounted
Two trailers per unit
gas only,  would be some cost to make them dual fuel if needed.
Original hours
    Unit 1         11,000 hours
    Unit 2           3,000 hours
    Unit 3           1,000 hours
Units have just been overhauled and will come with warranty.
Price 1.8 Million USD each,  Ready to ship
This if far less than anything in the market.

====================================================================

7.)   5 units SOLAR MOBILE TAURUS 60 (60 Hz)
FORMER OPERATOR: WILLIAMS ENERGY – USA
Taurus 60 Generation I units with Solar installed "full dual fuel capability".
Ability to run either liquid or natural gas.
Five (5) units available with low hours since new.
Taurus 60 Generation II units on straight gas
 $250K to add the remaining required parts to complete the full dual fuel capability.
currently have 80% of the liquid fuel components factory installed that are required
to complete the full dual fuel option.
These components cost $390K additional when the units where built.
(50-Hertz Conversion is available.)
Arrangement for conversion on any of the above units to 50-Hertz operation is possible.
The cost for this conversion is additional $300,000.00 to base price.
This price includes a One hour full load bank performance test
The converted unit will be rated 4500 KW ISO at 11 KV
Depending on your exact site requirement we provide a
Budget Price of US$ 2.9 - 3.2 million per low hour mobile package each.

====================================================================

8.)   Solar Saturn 20 Gas Turbine Package –
· running hours: 37500 ( for the complete Package )
· Starts: 504
· year of manufacturer: 1995
· Volt: 10 KV / 50Hz
· Fuel: Gas und oil
· Power 1350 KVA/1,2 MW
Available: immediately
Price: 195.000,00 EUR (surcharge not allowed - if commission is required - ask)
Dismantling, packing, loading: 40.000,00 EUR

====================================================================

9.)   Nine (9) Sets Sim’s Rated 975 K.W.  60 Hz
Simpower Model: SG1130M / Marathon Model 575RSL-4044
Rated 975 K.W. at 105 Deg. rise, 480V
Currently 60 hz, but can be 50 Hz , 380 volt if required
Approx 250 hours or less since new
Rating: Continuous Duty Power Factor 0.8
Kilowatt/KVA 830 K.W. / 975 KVA D/C Voltage 24 Volts
Fuel: Natural Gas
R.P.M. 1800
Ambient Temperature 25 C (77 F)
Phase 3 Elevation: 35 M (114.8FT.)
A/C Voltage 277/480 Frequency: 60 Hz.
We have these 9 sets for immediate inspection and delivery
Currently 60 Hz but easily adaptable to 50 Hz.
Price 340,000 USD each

====================================================================

10)   105 MW Siemens Gas Turbine Plant
Two complete Gas turbine Power Plants each consisting of two Siemens gas turbines
and all relevant auxiliaries in excellent condition, fully operable, ready for immediate delivery.
1982    Siemens    V94.2    120 MW       
1982    Siemens    V94.2    120 MW     
Currently on liquid fuel, but gas conversion equipment available
Description of  Gas Turbine Generators
GT units GT1 and GT2 are Siemens V94.2 heavy-duty gas turbines.
Each with a rated output of 120 MW at ISO conditions.Each GT unit is of single-shaft, single casing design,
equipped with 2 silo-type combustion chambers, a 16-stage compressor and a 4-stage turbine.
An air-cooled generator, rated at 125 MVA and generating at 10.5 kV is driven from the cold (compressor) end of the GT unit.
GT1 and GT2 are currently installed with Siemens diffusion-type burners for operation on distillate-oil liquid fuel. 
NEW Price 16.5  Million USD each       


From May 2009  Circular available

B1.)   31.64 MW Alsthom Gas Turbine  60 Hz
Price 7.6 Million USD

B2.)  90 MW  Gas Turbine Land Based  Dual Fuel  60 Hz
Price 18.5 Million USD

B3.)  120 MW  Alsthom Gas Turbine 60 Hz
Price 21.8 Million USD

B4.)  3 units 18 MW Pielstick = 54 MW, HFO Power Plant   60 Hz
Price: 2.9 Million USD - as where it is for the 3 units

B5.)   6 units 18 MW Pielstick = 108 MW, HFO Power Plant   60 Hz
Price: 5.8 Million USD for the 6 units

B6.)   3 units 5 MW = 15 MW Diesel Electric Power Plant   60 Hz
Price 5.8 Million USD

B7.)   6.6 MW MAN  HFO Power Plant  50 Hz
Price: Euro 725,000
 
B8.)   LM 2500 PE, Gasturbine 60 Hz  rebuilt
Price: 8.3 Million USD

B9.)   4 LM 6000 PC Sprint units 48 MW Gas turbine engine, 60 hz
Two units are from 2003:     Price 17.8 Million USD
Two units are from 2009:     Price 18.9 Million  USD

A1.)  500 MW 2 x 250 MW, ALSTOM units 50 Hz
Prices:  68.5  MIllion Euros - dismantling, packing & FOB port of dispatch
 
A2.)   Siemens 69 Mw Power Plant  50 Hz simple cycled
Price 11.5 Million USD

A3.)   Pratt & Whitney FT4A Power Pac
Price 2,375,000 USD

A4.)   Two (2) Pratt & Whitney FT4 A-9,
Price rebuilt   4,600,000  USD each

A5.)   5.45 Mw Power station comprised of 10 units of Komatsu
Price 1.4 Million USD

A6.)  Westinghouse W251 Combustion Turbine 38 MW 60 Hz
Price 2.9  Million USD     REDUCED PRICE - coming from 3.95 Million USD
  
A7.)   120MW 50Hz Thermal Power Plant for Sale    SOLD

A8.)   47 MW Siemens Gas Turbine SGT-800
Price is 17.5 million USD

A9.)   3.4 MW Complete Natural Gas Power Plant
Price 1.4 Million USD

A10.)   1 unit Steam Gensets 50 Hz 15 MW (BBC) Brown Boveri Company
Prices: 490,000 Euro (with boiler 750,000 Euro) - negotiable

A11.)   2 units Steam Genesets 4 MW (BBC) Brown Boveri Company 50 Hz
Price: 140,000 Euro each (with boiler 190,000 Euro each) - negotiable

For April 2009 and earlier circulars ask.

We can supply GE equipment/parts for turbines Solar, Westinghouse/ Fiat/ Siemens, Pratt Whitney.
We can also get almost any kind of large compressor, suitable for natural gas transmission,
both reciprocating, and turbine driven. and NG/ electric driven skids for gas turbine applications. 

Best regard
CH Non-Food Import-Export Corporation
British Virgin Islands
Phone: +1 206-201-240
Fax:     +1 206-337-0754
office6@ch-non-food.com
http://www.ch-non-food.com/