SECOND - HAND POWER - PLANTS

 Unused GE 7FA Combustion Turbines 171 MW each 60 Hz

Combustion Turbine Summary

Four, unused new GE 7FA combustion turbine generator sets in warehouse.

All four combustion turbine generator sets were shipped directly to storage and have been maintained in storage since shipment. Maintenancen activities include but not limited to are periodic generator meggars, borescope inspections, dehumidification, energization of heaters, electrical compartment HVAC, and motor rotations.

All turbines are GE 7FA.03 turbines and were originally designed for combined cycle applications.

The original warranties have expired. New warranties and performance guarantees need to be negotiated directly with GE.

Three consecutive serial number combustion turbines from a single order and one combustion turbine from an original order of three turbines are available. Upgrades are available from GE to further improve the output and heat rate of these reliable units. The turbines are all available for immediate shipment.

Three Units (never installed) Year of Manufacture: 2002 Indoor Installation 211 MVA, 60 Hz Generator 18 kV output, 0.85 pf Natural Gas Only DLN 2.6 Combustion System 9 ppm emissions Mark V Control System EX2000 with PSS Two LCI’s Provisions for inlet fogger Electrical and electronics equipment shipped loose Seismic: OBC 2002 -Group II Wind: OBC 2002 -90 mph Snow: OBC 2002 -20 psf

One FA (fifth unit) is installed. Others were canceled. We would need to add a Frame 7 FA to this. 2 x HRSG's are 90% installed. 2 x GE A10 STG's 95% installed. Don't have price yet. 345kV Substation is also installed.

Single Unit (installed) Year of Manufacture: 2002 Outdoor Installation 211 MVA, 60 Hz Generator 18 kV output, 0.85 pf Natural Gas Only DLN 2.6 Combustion System 9 ppm emissions Mark VI Control System EX2100 with PSS Single LCI PEECC provided Seismic: CBC-1998 Zone 4 Wind: CBC-1998, 80 mph Snow: Not listed