MITSUBISHI 144 MW – 701D GAS
TURBINE SPECIFICATION
Standby emergency for a Nuclear
power station Lifetime fired hours 5,429.77 with 620 starts Upgrade and
modernization to Nuclear standard in 2009 900 hours since upgrade
(1) Gas Turbine
Type : Open Simple Cycle Single Shaft Speed: 3,000 rpm Capacity 144 Mw Design
base Inlet Air Temp 5 C Atm Pressure: 1,033 kg/cm3
abs Relative Humidity: 60% Fuel : Light Oil or City Gas Light Oil Specific
Gravity: 0.83 HHV:10,800 kcal/kg *City Gas Specific Gravity:0.847 (kg/m3N) HHV:
11,000kcal/kg NOx control Water Injection + High
Temp. Nox Denitration NOx Limited Value G/T Outlet: not more than 50ppm (at
02-16%) Denitration Outlet :
not more than 20ppm (at 02-16%)
(2) Generator Type:
Cylindrical Rotating Field Type
Three Phase Synchronous Generator Rating Item: Apparent Output Power Factor
Relative Output Terminal Voltage Frequency No.of
Pole, Speed Cooling Method Insulation 160,000 KVA (at 5oC) 90% 144,000 kw 15,000 V 50 Hz 2 pole, 3,000 rpm Open Air Cooling Class
F Excitor Brushless Type using Silicon Rectifier and excitor Coupled with the Generator
Removal shared cost,
seller/buyer 375k USD to dock.
|
|