SECOND - HAND POWER - PLANTS
12.5 MW BIOMASS POWERPLANT
28.5 MW BIOMASS POWERPLANT

Waste To Energy Plant Power-Plant
7 MW 240 t per day, 50/60 Hz
This plant was designed as mass burn combustor capable of combusting
residential, commercial, and light industrial wastes.
The equipment is in excellent condition, a conclusion supported by the evaluation of
an independent internationally recognized third party engineer. Three other plants
developed using the same technologies continue to prove the value of this technology. Key plant operating systems iclude a 7 MW Asea Brown Boveria VAX Turbine and two Zurn
Boilers, a summary of major plant components could be provided.
The facilty was constructed at a cost in excess of $ 35 million. The facility was closed
as a result of failed business decisions forcing the project into financial bankruptcy. The plant operated for less than 5.000 hours. The facility was meticulously
decommissioned to preserve the asset value and based on the espectation of the lender that it would resume operations. Included with the equipment are plans, specifications, as built drawings, operation manuals and detailed Air Impact study conducted by the US Environmental Protection Agency which confirms the integrity of the design of the
plant.



12.5 MW BIOMASS POWERPLANT
Unit 1
The facility was commissioned in 1988 and mothballed on March 1, 1995. Biomass fuels burned at this facility include agricultural wood, forest wood, urban wood, miscellaneous ag shells, pits and pomace, straws, and stalks. Availability of the unit was 95%+ (excluding planned shutdowns) at 98%+ capacity factors.
Systems and Equipment Description:
1. Steam Turbine-Generator
One (1) General Electric steam turbine with General Electric 12.5 MW, 13,800 volts generator. Includes Ecolaire water cooled condenser, Philadelphia gear reducer, Woodward governor, I-R condensate pumps (2), lube oil and hydraulic systems, gland seal steam system, air ejectors, and switchgear control.
2. Atmospheric Fluidized Bed Boiler
One (1) Energy Products of Idaho (EPI) atmospheric fluidized bed combustor with one (1) Zurn forced circulation boiler generating 122,000 lbs./hr. of steam at 650 psig and 750oF. The boiler includes superheaters and economizers. Ancillary equipment includes Buffalo Forge 600 HP FD fan, Zurn 700 HP ID fan, tramp removal system (vibrating screens, sand bucket elevator), No. 2 oil fired start-up burner, fuel metering system, 250 HP motor driven Bingham boiler feed pump, Terry turbine driven boiler feed pump, two (2) motor driven boiler circulation pumps, soot blowers.
3. Fuel Feed
Fuel handling and fuel feed system includes a 10' x 70', 60 ton capacity Toledo truck scale; a fuel reclaim system that holds one (1) shift-supply of fuel consisting of a fuel building, two (2) top-of-pile chain scrapper, collection conveyors and, a transfer conveyor; two (2) drag chain, variable speed drive alternate reclaim conveyors; a 42" x 105' enclosed weigh belt conveyor, a 36" x 238' inclined enclosed belt conveyor; a 48" x 96" disc screen; a Jeffrey fuel hog; an electro magnet separator; a distribution drag conveyor; and two (2) metering bins each with dual variable speed driven augers.
4. Ash Handling System
Ash removal from the boiler evaporator, convection section, superheaters, economizer, multiclone, and baghouse includes drag chain conveyors (horizontal and inclined), screw conveyors, ash bin, and ash conditioning screw conveyor.
5. Air Pollution Control System
The air pollution control equipment includes a Zurn multiclone; a General Electric baghouse with six (6) compartments, pulse jet clean, ash hoppers and vibrators; a dry additive injection for sulfur dioxide control consisting of additive storage bin, rotary valve and pneumatic blower; and an ammonia injection for NOx control.
A continuous emission monitoring system (CEMS) is installed at the 65' stack to monitor NOx, SOx, CO, and O2.
6. Boiler Water Treatment System
The boiler water treatment includes a 240 GPM LA Water demineralizer unit consisting of strong acid cation bed, a degassifier, a strong base anion bed, a 20,000 gallons deionized water storage, a neutralization tank, and acid and caustic storage thanks. Additional boiler water treatment equipment includes condensate storage tank, boiler chemicals day tanks and metering pumps, and chemical storage tanks.
7. Cooling Tower
One (1) Marley 2-cell induced draft cooling tower designed for 14,000 GPM circulation and 108.5 MMBTU/hr duty. The tower has PVC film type fill, 100 HP fans (2), I-R 250 HP circulating pumps (2), and an I-R 10 HP, 500 GPM auxiliary pumps (2). Also includes cooling tower chemicals injection system consisting of chemical storage tanks and metering pumps.
8. Lined Liquid Impoundment Ponds
Three 5-ft. high open-top tanks (about 2 acres in total area) double lined with HDPE liner for storing high conductivity water such as neutralization tank effluent.
9. Air Compressor
Two (2) packaged screw compressor rated at 100 SCFM, 100 psig. Other equipment includes inlet filter, aftercooler, receiver, controls, and dual desiccant type air drier.
10. Transformer
General Electric step-up transformer, 12 mva, 3 phase, 60 Hz, 120 kv GRY/69.3 kv high voltage winding and 13.8 kv low voltage winding.
11. Distributed Control System (DCS)
Honeywell Bailey Net90 DCS for controlling operations of boiler, fuel feed system, turbine/generator, and

Unit 2
The facility was commissioned in 1990 and mothballed on March 1, 1995. Biomass fuels burned at this facility include agricultural wood, forest wood, urban wood, miscellaneous ag shells, pits and pomace, straws, and stalks. Availability of the unit was 95%+ (excluding planned shutdowns) at 98%+ capacity factors.
System and Equipment Description:
1. Steam Turbine-Generator
One (1) General Electric steam turbine with General Electric 12.5 MW, 13,800 volts generator. Includes Ecolaire water cooled condenser, Philadelphia gear reducer, Woodward governor, I-R condensate pumps (2), lube oil and hydraulic systems, gland seal steam system, air ejectors, and switchgear control.
2. Atmospheric Fluidized Bed Boiler
One (1) Energy Products of Idaho (EPI) atmospheric fluidized bed combustor with one (1) Zurn forced circulation boiler generating 122,000 lbs./hr. of steam at 650 psig and 750oF. The boiler includes superheaters and economizers. Ancillary equipment includes Buffalo Forge 600 HP FD fan, Zurn 700 HP ID fan, tramp removal system (vibrating screens, sand bucket elevator), natural gas fired start-up burner, fuel metering system, 250 HP motor driven Bingham boiler feed pump, Terry turbine driven boiler feed pump, two (2) motor driven boiler circulation pumps, soot blowers.
3. Fuel Feed System
Fuel handling and fuel feed system includes a 10' x 70', 60 ton capacity Toledo truck scale, two (2) drag chain, variable speed drive reclaim conveyors, a 42" x 105' enclosed weigh belt conveyor, a 36" x 238' inclined enclosed belt conveyor, a 48" x 96" disc screen, a Jeffrey fuel hog, an electro magnet separator, a distribution drag conveyor, two (2) metering bins with variable speed driven augers, and an excess fuel return conveyor.
4. Ash Handling System
Ash removal from the boiler evaporator, convection section, superheaters, economizer, multiclone, and baghouse includes drag chain conveyors (horizontal and inclined), screw conveyors, ash bin, and ash conditioning screw conveyor.
5. Air Pollution Control System
The air pollution control equipment includes a Zurn multiclone; a General Electric baghouse with six (6) compartments, pulse jet clean, ash hoppers and vibrators; a dry additive injection for sulfur dioxide control consisting of additive storage bin, rotary valve and pneumatic blower; and an ammonia injection for NOx control.
A continuous emission monitoring system (CEMS) is installed at the 65' stack to monitor NOx, SOx, CO, and O2.
6. Boiler Water Treatment
The boiler water treatment includes a Glegg reverse osmosis (RO) with 12 permeators in 3 pressure vessels capable of producing 15 GPM of treated water and two (2) Glegg mixed bed demineralizer units with strong acid cation/strong base anion, and degassifier also capable of producing 15 GPM of treated water. Additional boiler water treatment equipment includes boiler water storage tank, boiler chemicals day tanks and metering pumps, and chemical storage tanks.
7. Cooling Tower
One (1) Marley 2-cell induced draft cooling tower designed for 14,000 GPM circulation and 108.5 MMBTU/hr duty. The tower has PVC film type fill, 100 HP fans (2), I-R 250 HP circulating pumps (2), and an I-R 10 HP, 500 GPM auxiliary pumps (2). Also includes cooling tower chemicals injection system consisting of chemical storage tanks and metering pumps.
8. Air Compressor
Two (2) packaged screw compressor rated at 100 SCFM, 100 psig. Other equipment includes inlet filter, aftercooler, receiver, controls, and dual desiccant type air drier.
9. Transformer
General Electric step-up transformer, 12 mva, 3 phase, 60 Hz, 120 kv GRY/69.3 kv high voltage winding and 13.8 kv low voltage winding.
10. Distributed Control System (DCS)
Honeywell Bailey Net90 DCS for controlling operations of boiler, fuel feed system, turbine/generator, and other systems.



28.5 MW BIOMASS POWERPLANT
The facility was commissioned in 1989 and mothballed on March 1, 1995. Biomass fuels burned at this facility include agricultural wood, forest wood, urban wood, miscellaneous ag shells, pits and pomace, straws, and stalks. Availability of the unit was 95%+ (excluding planned shutdowns) at 98%+ capacity factors.
Systems and Equipment Description:
1. Steam Turbine-Generator
One (1) Elliot steam turbine with Brush 28.5 MW, 13,800 volts generator. Includes a Krueger Engineering water cooled condenser, Reliance gear reducer, Woodward governor, I-R condensate pumps (2), lube oil and hydraulic systems, gland seal steam system, air ejectors, and switchgear control.
2. Atmospheric Fluidized Bed Boiler
One (1) Energy Products of Idaho (EPI) atmospheric Fluidized bed combustor with one (1) Zurn forced circulation boiler generating 260,000 lbs./hr. of steam at 850 psig and 850oF. The boiler includes superheaters and economizers. Ancillary equipment includes Robinson 1750 HP FD fan, Zurn 1500 HP ID fan, tramp removal system (vibrating screens, sand bucket elevator), propane fired start-up burner, fuel metering system, 600 HP motor driven Sulzer Bingham boiler feed pump, Dresser Rand turbine driven boiler feed pump, two (2) motor driven boiler circulation pumps, soot blowers.
3. Fuel Feed System
Fuel handling and fuel feed system includes a 10' x 70', 60 ton capacity Toledo truck scale; a fuel reclaim system that holds one (1) shift-supply of fuel consisting of a fuel building, three (3) top-of-pile chain scrapper, collection conveyors, and a transfer conveyor; two (2) drag chain, variable speed drive alternate reclaim conveyors; a 48" x 570' inclined enclosed belt conveyor; a 48" x 252' weigh belt enclosed conveyor, a disc screen; a Jeffrey fuel hog (not installed); an electro magnet separator; a distribution drag conveyor; four (4) metering bins each with dual variable speed driven augers; and a 29-3/4" x 150' excess fuel return belt conveyor.
4. Ash Handling System
Ash from the superheaters, economizer, multiclone, and baghouse is pneumatically conveyed from the hoppers to the ash storage bin using Roots rotary positive blowers (2). An ash baghouse is mounted to top of the storage bin to filter out the ash from the conveying air. The ash is discharged into a trailer through the conditioning screw conveyor.
The ash from the boiler evaporator is conveyed to a bin using a vibrating conveyor.
5. Air Pollution Control System
The air pollution control equipment includes a Zurn multiclone; a Zurn baghouse with fourteen (14) compartments, reverse air cleaning system, ash hoppers and vibrators; a dry additive injection for sulfur dioxide control consisting of additive storage bin, rotary valve and pneumatic blower; and an ammonia injection for NOx control.
A continuous emission monitoring system (CEMS) is installed at the 65' stack to monitor NOx, SOx, CO, and O2.
6. Boiler Water Treatment System
The boiler water treatment system includes a 50 GPM LA Water reverse osmosis (RO) and demineralizer unit consisting of strong acid cation bed, and a strong base anion bed, a neutralization tank, and acid and caustic storage tanks. Additional boiler water treatment equipment includes condensate storage tank, boiler chemicals day tanks and metering pumps, and chemical storage tanks.
7. Cooling Tower
One (1) Thermal Dynamic 3-cell induced draft cooling tower designed for 16,000 GPM circulation and 216 MMBTU/hr duty. The tower has PVC film type fill, 125 HP fans (3), and I-R 600 HP circulating pumps (2). Also includes cooling tower chemicals injection system consisting of chemical storage tanks and metering pumps.
8. Lined Liquid Impoundment Ponds
Two ponds (2 acres total) double lined with HDPE liner for storing high conductivity water such as neutralization tank effluent.
9. Air Compressor
Two (2) Gardner-Denver reciprocating compressor rated at 155 SCFM, 135 psig. Other equipment includes inlet filter, aftercooler, receiver, controls, and dual desiccant type air drier.
10. Transformer
General Electric step-up transformer, 37.3 mva, 3 phase, 60 Hz, 120 kv GRY/69.3 kv high voltage winding and 13.8 kv low voltage winding.
11. Distributed Control System (DCS)
Honeywell Bailey Net90 DCS for controlling operations of boiler, fuel feed system, turbine/generator, and other

We are offering the plant "as/where is" for US$ 6.000.000,00,  reasonable offers will
be considered.
We could also provide our services of dismantling, packing, shipment and erection
supervision for this plant.
Due to the vast trash quantities which have to be removed in many areas a tonnage
fee/subsidy is given from the local government/municipality for the clean combustion
of the trash. This makes the investment even more attractive.
For more information please contact our project department!